Sanctuary Construction - Sealing The Exterior
On the north side of the sanctuary, a covered drop-off area will be provided.
The final exterior wall to be built was the front/eastern side.
Here is our project as of Friday, January 11, 2002.
Click here to see the next set of construction photos.