Home

Who We Are

Churches

Overview

Tegucigalpa Area

    San Jose de la Vega

    Fuerzas Unidas

    Ciudad Espana

Danli Area

    Danli Central

    La Jagua

    Escuapa

    La Cofradia

    El Paraiso

Talanga Area

    Talanga Central

    10 de Septiembre

Subirana

La Ceibita

Volunteer Teams

    Overview

    Calendar

    Preparations

    FAQs

    Youth Teams

    Team Reports

    Adopt-a-Project

Health Care Teams

    Health Care Manual

    Health Care Ed.

    Community Needs

       Assessments

Ways to Help

Newsletters

People and Events

Contacts and Key

    Personnel

 

 

 

 

Adopt-A-Project

Adopt-A-Project is a program of the UM Mission Church in Honduras that can help meet the needs of some construction projects that are not suitable for VIM teams but are still important needs of the Mission.  At times, UMVIM projects reach a final stage of construction that cannot done by volunteers. These projects can best be completed with donations of money to purchase materials and hire skilled local laborers.  This is how our North American UM churches and present and former UMVIM supporters can help.

Honduran pastors will be able to participate in choosing these projects for their congregations. Pastors are the official hosts of the VIM teams and have built lasting relationships with many UM churches in the U.S. They are at the forefront of every area of ministry in the UM Mission Church in Honduras. You can help them and the churches they serve to continue to go forward making disciples of Jesus Christ and building the Kingdom of God in Honduras by adopting one of these projects. The church will be blessed and you will be blessed by God for your sacrificial gift.

You do not have to send funds for 100% of the project you choose. We invite Sunday School classes, UM Women’s groups, UM Men’s groups, Vacation Bible Schools, individuals, families, and service organizations to donate to these projects.  

Look at the projects listed below. Click on the link for more details about the project and the cost.

You can make donations in two ways:

  1. Give through the Advance Program of the United Methodist Church. Go to www.advancinghope.org for instructions. Designate your gift to the United Methodist Mission Church in Honduras--12928A and the Adopt a Project number.  Please send an email to: metodista_honduras@yahoo.com advising us that you have made a donation.

                          OR

  1.  Send a check directly to the United Methodist Mission in Honduras at the following address:

Atten: Treasurer

Iglesia Metodista Unida en Honduras

TGU 00073

P.O. Box 025387

Miami,  FL   33102-5387

            Please memo the check with the Adopt a Project number.

                                                        PROJECTS LIST

Adopt-a-Project Project Number (Click for link)

Church Location

Project Name

2009-1-a

Talanga

Sewer Connection

2009-1-b

Talanga

Potable Water Connection

2009-1-c

Talanga

Bathroom fixtures 

2009-1-d

Talanga

Lighting fixtures

2009-1-e

Talanga

Security bars

2009-2

La Jagua

Recreational Area

2009-3

El Paraiso

Kitchen Installations

2009-4

Escuapa

Church floor tiling 

 

 

 

 

 

 

 

 

 

     
     

 

                                       

 

 

Adopt-a-Project2009-1-a

Project #: 2009-1-a

Church Location: Talanga

Project Name: Sewer Connection

Project Description: Connect the sewer system from the house to the street

Budget: $450

Responsable Pastor: Luis Soto

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

 

 

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project2009-1-b

Project #: 2009-1-b

Church Location: Talanga

Project Name: Potable Water Connection

Project Description: Connect potable water to the bathrooms and kitchen

Budget: $250

Responsible Pastor:  Luis Soto

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

 

      

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project2009-1-c

Project #: 2009-1-c

Church Location:

Project Name: Bathroom fixtures

Project Description: Purchase and installation of fixtures for 3 bathrooms

Budget: $1270

Responsible Pastor:  Luis Soto

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

 

      

Two post-project photos:

Back to Adopt-A-Project Projects List

 

 

Adopt-a-Project2009-1-d

Project #: 2009-1-d

Church Location: Talanga

Project Name: Light Fixtures

Project Description: Installation of lighting fixtures in the Church House

Budget: 250

Responsible Pastor:  Luis Soto

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project2009-1-e

Project #: 2009-1-e

Church Location: Talanga

Project Name: Security bars

Project Description: Installation of security bars on the windows on the Church House

Budget: $725

Responsible Pastor: Luis Soto

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

 

Adopt-a-Project 2009-2

 

Project #: 2009-2

Church Location: La Jagua

Project Name: La Jagua Recreation Area         

Project Description: This project involves laying a concrete pad which can be used for a basketball court, badminton court, soccer area or other outdoor games such as, dodge ball, jumping rope etc

Budget:

Responsible PastoraAlbita Lagos

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

 

                     

 

     

Back to Adopt-A-Project Projects List

 

Adopt-a-Project2009-3

Project #: 2009-3

Church Location: El Paraiso

Project Name: Kitchen Completion

Project Description: This project involves painting the walls, connecting potable water and installing a sink, stove and refrigerator in the kitchen area so that the congregation can prepare meals for the VIM teams and other church activities.

Budget: $1500

Responsible Pastor: Bernabe Moran Barrios.

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

   

      

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project   2009-4

Project #: 2009-4

Church Location: Escuapa

Project Name: Church floor tiling

Project Description: I

Budget: $2,800 Includes materials and labor

Responsible Pastor: Efrain Sosa

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

 

                                          

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project

Project #: 2009-

Church Location:

Project Name:

Project Description: I

Budget:

Responsible Pastor: 

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project

Project #: 2009-

Church Location:

Project Name:

Project Description: I

Budget:

Responsible Pastor: 

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project

Project #: 2009-

Church Location:

Project Name:

Project Description: I

Budget:

Responsible Pastor: 

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project

Project #: 2009-

Church Location:

Project Name:

Project Description: I

Budget:

Responsible Pastor: 

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project

Project #: 2009-

Church Location:

Project Name:

Project Description: I

Budget:

Responsible Pastor: 

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project

Project #: 2009-

Church Location:

Project Name:

Project Description: I

Budget:

Responsible Pastor: 

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project

Project #: 2009-

Church Location:

Project Name:

Project Description: I

Budget:

Responsible Pastor: 

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List

 

Adopt-a-Project

Project #: 2009-

Church Location:

Project Name:

Project Description: I

Budget:

Responsible Pastor: 

Sponsors:

Contribution

Funding Progress

                                       

    0%                                  25%                                50%                               75%                                100%

Two pre-project photos

Two post-project photos:

Back to Adopt-A-Project Projects List