The shingles are installed on the education wing and porch off the fellowship hall.
The portico roof is built.
The rear wall of the fellowship hall is built out of 2 x 10 (heavy duty!)
The front wall (40 feet tall) of the sanctuary is built. Notice the eight front windows.
The portico (car port) is completed. This will be nice on those rainy days.
Sanctuary view from the upper level.
The windows are installed.