A picture of the rear parking lot. Scroll down for more pictures.
Setting rebar in the footer
Pouring the concrete footers with a concrete pumping truck
Poured footer in the section that enters the classroom wing
Center of building
The sanctuary 80 foot steel beam being loaded on the truck at Suburban Steel in Gahanna

The massive 17,000 lbs. beam that is the main support for the sanctuary
Looking out at the portico (outside covered car drop off area)
Estel Miller at the Beam Signing on Tuesday May 29, 2007
A message on the beam.
Boy Scouts from Troop 300 at the Beam Signing.
Jim Irwin (Scoutmaster Troop 300) with scout
The completed steel structure (May 30, 2007)