December 2007 Pictures

The finished stage in the front of the sanctuary.

The heating and cooling ducts are being installed in the fellowship hall. Drywall and insulation can also be seen on fire stops and the main firewall.

The plumbing and electric is installed throughout the church.

The first coat of stucco is applied to the exterior .

 

Home