WW Grading is performing the site construction. Pan and bulldozer cut the detention pond.
Precast concrete drainage basins will be placed in the parking lot to handle rain from storms.
The building pad was raised 1 foot with clay from the pond. A machine called a sheeps foot compacts the clay fill dirt.